What are the construction and demolition waste rules in Los Angeles?
Mixed construction and demolition waste in the City of Los Angeles needs a permitted hauler and a City-certified processor. The building permit application names that hauler. On covered projects, CALGreen, the state green building code, sets a 65 percent minimum for recycling or salvage.
Did a permit application ask you for a hauler permit number? The City’s construction and demolition (C and D) rules are the reason. Hauling remodel and new-build debris off is our construction cleanup work. Southwest Hauling is a demolition and hauling contractor in Los Angeles, licensed and insured, CA License 792182.
The City’s C and D recycling ordinance
The citywide C and D waste recycling ordinance is Council File 09-3029. The Los Angeles City Council approved it on March 5, 2010. All mixed C and D debris generated in the City must be hauled by a permitted private waste hauler.
The hauler’s permit is the AB 939 Compliance Permit, also called a Waste Hauler Permit. It comes from the Bureau of Sanitation, known as LA Sanitation or LASAN. The rule sits in the Los Angeles Municipal Code (LAMC), section 66.32.1. Anyone who collects, removes or transports C and D waste generated in the City needs the permit.
A permitted hauler must deliver all mixed C and D waste to City-certified mixed C and D processing facilities. A load may go elsewhere only if at least two certified facilities refuse it and give rejection slips. Those slips are kept for at least three years.
Source-separated material is the exception. When it goes to a recycling facility, or is recycled on site, the certified-facility rule does not apply. A hauler’s C and D bins in the City must be marked with the hauler’s name and phone number.
The City’s penalties per load
LASAN assesses penalties of up to $5,000 for every load not taken to a certified processor. LAMC 66.32.3(b) sets the steps:
- $1,000 for the first violation
- $2,000 for a second violation within six months
- $5,000 for a third violation within six months
- $5,000 for each violation after that
Each load delivered in violation counts as a separate violation.
The building permit side
LASAN works with the Department of Building and Safety (LADBS) to check hauler permits on building permit applications. LADBS asks for the construction waste hauler’s company name and its Waste Hauler Permit Number. The hauler must be on the Permitted Waste Haulers list.
Applicants who haul their own debris show their own hauler permit instead, LASAN says. Mechanical, electrical and plumbing permits do not need the hauler information.
The Los Angeles Green Building Code is based on CALGreen. LADBS reviews green building compliance on new construction and on additions or alterations that increase conditioned volume. Alterations valued over $200,000 get the review too. Green Building Division approval is required before the building permit is issued.
LAMC 99.05.408.1 is the City’s nonresidential green building rule on construction waste diversion. It says to comply with LAMC 66.32, the hauling rule above. For a teardown, our guide to demolition permits in Los Angeles covers the LADBS steps.
CALGreen and the 65 percent rule
CalRecycle says CALGreen covers locally permitted new residential and nonresidential construction. Demolition and certain additions and alterations are covered too. Those projects must recycle or salvage for reuse at least 65 percent of their nonhazardous C and D debris.
Three ways to meet the 65 percent
CalRecycle’s CALGreen summary lists three ways to comply:
- The contractor keeps a waste management plan and documents diversion and disposal.
- The project uses a waste management company that can document 65 percent diversion.
- On low-rise residential work, 3 stories or less, new construction disposal stays at or under 3.4 pounds per square foot.
Demolition-only permits
CalRecycle’s summary of the 2019 and 2022 codes draws a line here. A demolition-only permit, one that is not part of a construction permit, is outside the scope of CALGreen. That summary was last updated March 10, 2023.
Local rules still apply. Inside the City, mixed debris from a demolition-only job still needs a permitted hauler and a City-certified facility.
What gets recycled, and what stays out of the load
LASAN gives these examples of recyclable C and D material:
- Concrete, asphalt, brick, dirt and mixed inerts
- Wood waste
- Gypsum and wallboard
- Scrap metal
Broken slab from concrete removal is on that list, and so is the dirt from dirt removal. LASAN publishes an interactive map and a yearly list of the City-certified C and D processors. Its 2026 list includes certified processors in Gardena and Long Beach.
What stays out of a C and D load
Household hazardous waste stays out: CalRecycle says disposing of it in the garbage is illegal.
The South Coast AQMD requires an asbestos survey before demolition, regardless of when the building was built. Our AQMD Rule 1403 guide covers the survey. A separate certified abatement contractor handles any asbestos.
Treated wood from old fences and decks
The Contractors State License Board says demolished treated wood decks, fences, gazebos and retaining walls are treated wood waste (TWW). The Department of Toxic Substances Control (DTSC) says households usually create TWW when a fence or deck is replaced.
TWW is kept separate from other materials. It may not be burned, chipped, ground or mulched. It may only be disposed of at landfills approved by the State Water Resources Control Board. In Los Angeles County, the Board’s list includes the Sunshine Canyon, Calabasas and Burbank landfills.
Hauling your own, and jobs outside the City
LAMC 66.32.1(a)(4) makes an exception for residence owners who personally do construction or demolition at their own home. If they haul the waste in their own vehicles, the hauler permit rule does not apply to them.
If that is you, ask LADBS what your permit application needs. LA Sanitation’s free bulky item pickup does not take construction materials such as concrete, bricks and dirt.
The City’s rules cover waste generated in the City of Los Angeles, San Pedro included. CalRecycle says every city and county must adopt CALGreen sections 4.408.1 and 5.408 in its municipal code. So Santa Monica, Beverly Hills, Long Beach and Torrance each run their own version. For a job in one of those cities, check with that city’s building department first.
The rules at a glance
| Rule | Who it covers | What it requires | Agency |
|---|---|---|---|
| C and D ordinance, Council File 09-3029 | Mixed C and D debris from the City of Los Angeles | A permitted hauler and a City-certified facility | LASAN |
| AB 939 Compliance Permit, LAMC 66.32.1 | Anyone hauling C and D waste generated in the City | The permit, certified facilities, marked bins | LASAN |
| Penalties, LAMC 66.32.3(b) | Loads not delivered to a certified facility | $1,000 first, then $2,000 and $5,000 for repeats within six months | LASAN |
| Hauler details on the permit | Building permits, not mechanical, electrical or plumbing | Hauler name and Waste Hauler Permit Number | LADBS |
| CALGreen 4.408 and 5.408 | Locally permitted new construction, demolition, certain additions and alterations | 65 percent recycled or salvaged for reuse | Each city or county |
| Treated wood waste | Demolished treated wood decks and fences | Kept separate, approved landfills only | DTSC and the State Water Board |
How our crews handle demolition debris
We were founded in 1994 and run multiple crews with our own trucks and equipment. On a house demolition or an interior demolition, the debris leaves in our trucks the same day. Clean concrete goes to certified recycling facilities, where it is crushed for base rock. Metal goes to metal recycling.
You never have to rent a dumpster. Our job site safety page covers how we run a site. An estimator comes out for a free in-person estimate. Call (310) 546-4855.
This guide sums up the City and state rules in plain language. The official code text governs, and nothing here is legal advice.